Seaworld Sesame Parade Route Lighting

Completion Date: 2018
General Contractor: Chula Vista Electric Co. 
Client: Seaworld Parks & Entertainment
Location: Seaworld San Diego
Description: Chula Vista Electric was selected to install theater lighting and sound infrastructure to more than 20 locations scattered throughout the Sesame Street Parade Route within the park. 17 steel poles with concrete bases were installed along with power and CAT 6 cables to each. Conduit routing was strategically planned to minimize concrete saw cutting and disturbance of established landscaping and pathways. A number of branch panel board upgrades were also performed as part of the scope.