Our Projects
General Contractor: Bloom Energy Corporation
Client: Genentech, Inc.
Location: Vacaville, CA
Description: CVE performed the electrical scope for the installation of multiple MegaWatt fuel cell projects at Genentech, Oceanside and Vacaville locations. The scope of work included installation of medium voltage transformers, pad-mounted switchboards, lineups of energy saver panels along with fuel cell modules, and all associated underground conduit, conductors, and terminations. Both projects were completed on schedule, requiring night and weekend work and a delicate balance of system integrations as it was put online and was ultimately incorporated into the facilities overall energy plans.
Bloom Energy 4MW
Completion Date: 2020General Contractor: Bloom Energy Corporation
Client: Genentech, Inc.
Location: Vacaville, CA
Description: CVE performed the electrical scope for the installation of multiple MegaWatt fuel cell projects at Genentech, Oceanside and Vacaville locations. The scope of work included installation of medium voltage transformers, pad-mounted switchboards, lineups of energy saver panels along with fuel cell modules, and all associated underground conduit, conductors, and terminations. Both projects were completed on schedule, requiring night and weekend work and a delicate balance of system integrations as it was put online and was ultimately incorporated into the facilities overall energy plans.